Steel Structures for the Melting and Casting Halls of Sepid Farab Kavir Steel Complex


































Farab Kavir Steel – Melting and Casting Plant: The fabrication, transportation, and installation of steel structures for the Farab Kavir Steel Production Complex, with an overall project capacity of 23,000 tons, were carried out in Kashan. The scope included the fabrication and installation of steel structures for the melting and casting plant halls, weighing 10,500 tons, the billet storage warehouse, weighing 800 tons, and the rebar rolling mill halls, weighing 6,700 tons. Farab Kavir Steel – Fixed Silos: The fabrication and execution of steel structures for the fixed silos inside the melting and casting hall, as well as the material handling system at the Farab Kavir Steel Production Complex, with a total recorded weight of 632 tons, were carried out in Kashan. These structures form part of the infrastructure required for material storage and handling within the production process.